2004 TRENCHES PC 23
& 25
Robert Vander Poppen, Field Supervisor
Martha Reichert, Assistant Field Supervisor

Field Supervisor
and Assistant Field Director Robert Vander Poppen.
Week 1:
The first few weeks of excavation at Poggio
Colla are always characterized by the excitement of the students
to get immediately into the tasks of excavation, as well as the
unfortunate necessity of removing the backfill from the previous
seasons. Unfortunately at the end of each season we are forced
to place the excavated dirt back into the trench in order to
protect the unexcavated soil and also the exposed architecture.
As a result we were forced to spend most of the first week exposing
the soil we intend to excavate this season.

Removal of backfill from
Trench PC 23 at the beginning of the season.
By the end of the first week we had removed
all of the soil and begun our first excavation. We have decided
to focus on the northeast corner of the trench, along with the
western section of the trench. In past seasons we have discovered
a number of interesting features in these areas which we will
continue to explore. The western end of the trench produced an
excellent record of the destruction of the third phase building
atop the site along with very deep strata from the earliest phases
of the site. In this area last season we excavated a number of
finds associated with an early votive deposit. The pit associated
with this votive deposit was then enclosed with a moulded podium
block which may be from the earliest phases of the sites. We
will conclude the excavation in this area with the lowest layers
of the stratigraphy in this area.

Deep strata from the earliest
phases of the site visible in trench.

Robert Vander Poppen coaching
students in PC 23.
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6
Week 7 - Final Report
Director, Gregory Warden
gwarden@mail.smu.edu
Director, Michael Thomas michael.thomas@tufts.edu
While the team is in
Italy during the summer field season, send e-mail to: mvap3@dada.it
To email an individual
on the team, enter the person's last name in the subject heading.
Excavation house phone:
055-844-9834, or, when calling from the US: 011-39-55-844-9834.
Introduction | 2004
Field Season | Poggio Colla Field
School | Whats New | Staff | Students
Site
History | Directors' Diaries
| Student Diaries | Excavation
Friends | Facilities | Conservation | Surveys
Robert Belanger
| Katherine Blanchard | Josh
Moran | Caitlin Vacanti | Ivo van der Graaff | Robert
Vander Poppen
QuickTime
VR | Site Set-Up | Dig
Daily Life | Excavation
Process | Field Manual | Lectures | Season's
End
Archives
| Finds | Research
Projects | Publications |
Bibliography | Mugello
Area | Home
|