2004 TRENCHES PC 19,
22, & 27
Caitlin Vacanti, Field Supervisor
Jessica Galeano, Assistant Field Supervisor
Week 3:
Field Students:
Elizabeth Bair
Rachael Henry
Benjamin Luley

Rachael Henry excavating
between stumps in the north locus of PC 27.
This week our official trench team began
excavating together for the first time. Ben, Liz and Rachael
all worked in the north locus of PC 27, where we are starting
to see linear stone formations along the eastern scarp and a
plethora of ceramic fragments in the western half. Unfortunately
this locus is full of stumps, which always prove to be a hindrance
in making a flat pass and determining stratigraphy. Tree stumps
and roots like to wrap around walls and other important architectural
features. Despite this obstacle, however, some of the stumps
have already been removed and thrown off the side of the hill
accompanied with a mandatory shout of relief. Most of the finds
thus far have been fineware bases and rims, with an occasional
black glaze vessel fragment.

Ben Luley in the north locus
of PC 27.
On her own in the northeast locus of PC
22, Jess has excavated through a much earlier stratum. She found
many large pieces of bone and teeth in a patch of soil that also
contained burnt organic material. We believe this to be a votive
deposit, possibly following some sort of sacrificial ritual.

Assistant Field Supervisor
Jessica Galeano excavating bone in PC 22.

Jess Galeano excavating in
the northeast locus of PC 22.

The area Jess Galeano is excavating.
We have had a good time this past week
and I could not be happier with our team. I look forward to further
excavation in PC 27 after the four-day break and completing all
work in PC 19 and 22.

Liz Bair and Rachael Henry rest their aching backs in PC 27.

Field Supervisor Caitlin
Vacanti excavating.
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6
Week 7 - Final Report
Director, Gregory Warden
gwarden@mail.smu.edu
Director, Michael Thomas michael.thomas@tufts.edu
While the team is in
Italy during the summer field season, send e-mail to: mvap3@dada.it
To email an individual
on the team, enter the person's last name in the subject heading.
Excavation house phone:
055-844-9834, or, when calling from the US: 011-39-55-844-9834.
Introduction | 2004
Field Season | Poggio Colla Field
School | Whats New | Staff | Students
Site
History | Directors' Diaries
| Student Diaries | Excavation
Friends | Facilities | Conservation | Surveys
Robert Belanger
| Katherine Blanchard | Josh
Moran | Caitlin Vacanti | Ivo van der Graaff | Robert
Vander Poppen
QuickTime
VR | Site Set-Up | Dig
Daily Life | Excavation
Process | Field Manual | Lectures | Season's
End
Archives
| Finds | Research
Projects | Publications |
Bibliography | Mugello
Area | Home
|